The Spotlight – Bill’s Retirement

This quarter’s spotlight is on Bill Satzler! It took some doing, but he actually agreed to let me write a little story about him. (Not that he had much choice in the matter!)

 

First, I want to say congratulations to Bill on his retirement after 26 years at Action! Bill will be leaving at the end of September. 26 years is a long time! So how did it all begin??

Bill is originally from Pennsylvania. Being one of four boys, you can imagine that sports played a big part in his growing up. Their back yard was the neighborhood’s ball field. Upon graduating from Penn State in 1974, Bill went to work for Bechtel Construction building Nuclear Power Plants. This gave him opportunities to live around the United States and to work at Arkansas Nuclear One, ANO, in 1983 where he met his beautiful wife Connie and son Josh. They were married in 1984. While they moved back east for 10 years, they decided to step away from the hectic nuclear life and took up roots in York, Pa. where Bill worked for a few local mechanical contractors.

Bill and Connie looked into moving back to Arkansas and, thru some twist of fate, Bill’s resume got into the hands of Dan Johnston, founding partner of Action, Inc. Dan had been looking for a Project Manager/Estimator for their new Little Rock office. After a couple of phone calls, Bill flew into AR and interviewed with Dan and Ron Wright at the Barling office. At that time, the Barling office was actually a separate building where the office parking lot is. Bill flew back home with an offer to consider with Connie. He accepted and their new life began. Bill’s career at Action began in 1994. Since that time, Bill has been the driving force to many exceptional success stories. Consequently, he was promoted to Vice President – Chief Estimator at Action, Inc.

When asked to list several of his favorite projects he’s worked on at Action, Bill put the War Memorial Stadium in Little Rock at the top of his list. This was a renovation to the concourse area, restrooms, offices and home team locker room back in the Danny Ford era. Bill said he didn’t care for him either. The project was given a timeline that nobody thought could be possible to complete. Bill was happy to announce that it was done on time! Bill also listed the Army Aviation Black Hawk helicopter hangar at Camp Robinson, Central High School Renovation and the Arkansas Surgical Hospital in Little Rock. He said he looks back proudly on these projects, along with many others.

When asked what his thoughts are about working at Action for all those years, Bill replied that it has been a very enjoyable ride and worked with some very talented and skilled people. He was glad to be a part of the Action Family. When asked what Bill has to say about his retirement, he paused and then replied, “I’m very excited; this is a new beginning.”

Bill’s plans for the future; he and Connie want to travel to the many wonderful places right here in the USA, go fly fishing, biking, and just enjoy more time with each other.

In closing…..Bill, my wish to you is that, you and Connie will share many years together, staying healthy, happy, traveling, and seeing all the places you dream of. Enjoy your retirement and when the moment hits, stop by and say hi!!
Stay safe my friend.  Robin D’Onofrio

Share post

"*" indicates required fields

To request an application, fill out the following information:

Name*

Trimble

Trimble Job Site Solutions Total Station transfers CAD data to the job site via the Trimble MEP Nomad wireless hand held device. This technological leap eliminates the need for manual measurements on the job site, saving time and reducing costly errors.

VDC

Autodesk Fabrication CADmep and CAMduct are detailing tools used to generate production drawings such as ISO spools, coordination overlays, or 3D spatial coordination with Navis Works. The use of Building Information Modeling (BIM) eliminates the inefficiencies of the traditional method of Design-Bid-Build and two-dimensional (2D) drawings by facilitating collaboration among project team members and by illustrating the project design through three-dimensional (3D) visualization.

Fabrication

We design, manufacture and deliver in our 35,000 SF manufacturing facility. Ductwork and piping ranging from mechanical rooms to fixture batteries to below-grade rough-ins are prefabricated in our facility.

HVAC

We provide installation and maintenance for all types of HVAC equipment and systems. Our full range of capabilities include split systems, packaged RTU’s, built up AHU’s, chillers, boilers, and VAV distribution systems.

Plumbing

We are licensed to install and repair all types of plumbing systems including: domestic water, medical gas, sewer, storm, propane and natural gas.

Hydronic Piping

We can prefabricate much of our hydronic piping to improve quality and increase installation efficiency. We can install all types including steel and copper pipe for hot water, steam, condenser water and chilled water systems.

Value Analysis

For projects with completed designs we can provide recommendations to assist with budget or schedule challenges.

Design/Development

We offer a team approach to reach your design and budget goals.

Budgeting

We assist you in determining project feasibility by providing conceptual estimates and constructive feedback from a nationally recognized Mechanical Contractor.