Glatfelter Ft. Smith is an existing 200,000 sq. ft. Mitsubishi building located at Chaffee Crossing. The existing building is being retrofitted by Glatfelter to meet their needs. Glatfelter is a domestic and international paper manufacture. The Fort Smith plant will create 83 high-skilled jobs. Action is under contract for $5.4 million.
General Contractor: Glatfelter
Architect/Engineers: Cromwell
Project Start Date: 12-22-2016
Project End Date: 12-1-2017
Project Manager: Andy Moreton
Foreman: Errick Ellington
Systems Include:
- Condensing Water
- Process Chill Water
- Heating Water
- RO Water
- Process Water
- Domestic Water
- Sanitary Sewer
- Condensate Piping
- Natural Gas & Compressed Air
Subcontractors:
- Concrete
- SSI, Insulation
- Pro Insulation, Steel/Crane
- Holmes Erecting, Utilities
- AJ Greenwood, Core Drilling
- Any Concrete Cutting, Excavation
- Hightower Construction & Duct
- ECS