The Stroud High School project is a 43,500 square foot educational facility that we are performing the plumbing scope of work on for Atlas Construction.  It’s a 2 story building built into the side of a hill where, coincidentally, a high water table exists – therefore, one big aspect of this job was an extensive subsurface drainage system that was installed during the underground phase of the project.  Other notable features include 4” copper water mains, 6” low pressure gas piping system (compliments of our prefabrication shop), 200 total plumbing fixtures, a full service kitchen, agricultural education shop, and science lab – all under one roof (no separate buildings).  Also of note, ballistic wall paneling was installed behind the gypsum wall board in key locations to protect students from small caliber firearm cartridges in the event of an emergency.

Start Date: Late 2017
Estimated Completion: Mid 2019
Project Manager: Mike Armer
Assistant Project Manager: Josh Gilchrist
Foreman: Jeff Armer (Journeyman Plubmer)
Journeymen: Archie Gamble, Kris Williams
Apprentices: Mike Sturdevant, Dawson Hudson

"*" indicates required fields

To request an application, fill out the following information:

Name*

Trimble

Trimble Job Site Solutions Total Station transfers CAD data to the job site via the Trimble MEP Nomad wireless hand held device. This technological leap eliminates the need for manual measurements on the job site, saving time and reducing costly errors.

VDC

Autodesk Fabrication CADmep and CAMduct are detailing tools used to generate production drawings such as ISO spools, coordination overlays, or 3D spatial coordination with Navis Works. The use of Building Information Modeling (BIM) eliminates the inefficiencies of the traditional method of Design-Bid-Build and two-dimensional (2D) drawings by facilitating collaboration among project team members and by illustrating the project design through three-dimensional (3D) visualization.

Fabrication

We design, manufacture and deliver in our 35,000 SF manufacturing facility. Ductwork and piping ranging from mechanical rooms to fixture batteries to below-grade rough-ins are prefabricated in our facility.

HVAC

We provide installation and maintenance for all types of HVAC equipment and systems. Our full range of capabilities include split systems, packaged RTU’s, built up AHU’s, chillers, boilers, and VAV distribution systems.

Plumbing

We are licensed to install and repair all types of plumbing systems including: domestic water, medical gas, sewer, storm, propane and natural gas.

Hydronic Piping

We can prefabricate much of our hydronic piping to improve quality and increase installation efficiency. We can install all types including steel and copper pipe for hot water, steam, condenser water and chilled water systems.

Value Analysis

For projects with completed designs we can provide recommendations to assist with budget or schedule challenges.

Design/Development

We offer a team approach to reach your design and budget goals.

Budgeting

We assist you in determining project feasibility by providing conceptual estimates and constructive feedback from a nationally recognized Mechanical Contractor.